YOUR SITE. YOUR SCOPE.
Drainage and finished elevations
Include the location of inlets, curb lines, and existing surface connections. Removal and resurfacing should be coordinated with the project’s drainage and elevation requirements.
Useful details for your inquiry
- The project address in McKinney and access points
- Approximate pavement area and specified removal depth, if known
- The proposed schedule and any phasing restrictions
- Whether the next step is an overlay, repairs, or reconstruction
Site suitability, scope, and availability need to be confirmed for each project. Listing a city does not guarantee a particular response time or start date.

